![](https://emeatribune.com/wp-content/uploads/2024/06/prepare-for-two-nights-of-i-5-lane-closures-as-crews-create-bridge-to-nowhere.png)
Drivers headed south on Interstate 5 to Tacoma Monday and Tuesday evenings should plan extra time in their schedules.
The decommissioned 70th Avenue East bridge over I-5 in Fife will become a “bridge to nowhere” according to the state Department of Transportation.
It’s part of the state Route 167 Completion Project that’s been under construction since 2022 between state Route 509 and I-5. A toll road between SR 509 and I-5 is being built as part of the project.
The new Wapato Way East bridge was built over I-5 in 2021. The old nearby 70th Avenue East bridge at the Fife curve has since been used by construction vehicles.
The bridge must be removed to make room for a new bridge that will carry the future SR 167 tolled expressway over I-5.
On Monday and Tuesday nights, a 75-foot-long section of the old bridge is coming down. The section does not cross any lanes of I-5 but will require the closure of two of the freeway’s five southbound lanes. The lanes will be closed for approximately a 1/2-mile stretch approaching the bridge at milepost 138, beginning at 7:30 p.m. each night.
Both lanes are scheduled to be open by 6 a.m. daily.
The toll road between I-5 and the Port of Tacoma is scheduled to open in 2026.
EMEA Tribune is not involved in this news article, it is taken from our partners and or from the News Agencies. Copyright and Credit go to the News Agencies, email news@emeatribune.com Follow our WhatsApp verified Channel